Characteristics

  • Electrical safety tests (high voltage, insulation resistance)
  • Winding resistance test
  • Surge test
  • Measurement of electrical parameters
  • Manual voltage setting (PLC controlled power source is optional)
  • Double station
  • Test time: 8..10s
  • Ready for I4.0

Customer Needs

Performing all electrical safety and quality tests and forming of winding heads with a single device with a test time of approximately 8..10 seconds

Solution

We have developed a dual-station test bench with non-simultaneous operation.
A cradle with a pneumatic forming and wrapping system is mounted on each station. A rack column contains All the instrumentation , together with the PC and the electrical part . All the results are transmitted to the external server. Production analysis software based on a local database has also been integrated.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.